Project Description

This project is a new, ground up multipurpose facility with space that included classrooms, a commercial kitchen, locker rooms, a weight room, and a basketball gymnasium.

Construction Methods

The project was a hybrid structure that included both conventional steel and pre-engineered steel building components on a reinforced concrete foundation. Exterior wall finishes included metal panels and cultured stone on cold formed stud walls with gypsum sheathing as well as burnished concrete masonry unit walls around the gym. Roofing materials included standing seam metal roofing and TPO roofing. Air conditioning is provided by rooftop package units. Plumbing was underground copper. Fluorescent lighting was utilized throughout the space.