Project Description

Collier Construction worked alongside the customer to develop the site location plan. The teamwork and coordination between Collier, the architect, engineer, and customer ultimately constructed the La-Z-Boy on Milwaukee Avenue.

Construction Methods

This project was constructed using ICF Concrete Block for the walls, and convectional steel with TPO roof for the structure. The Exterior included EFIS and aluminum storefront glass systems. The interior featured custom paint, custom graphics, floating ceiling elements, and custom millwork.